Concrete for a 10×20 Slab at 6" Thick

A 10 ft × 20 ft slab poured 6 inches thick is 200 sq ft and needs 3.70 cubic yards of concrete — order 4.00 CY to cover 8% waste, or about 180 80-lb bags for a small pour. Adjust the dimensions below for your project.

Concrete needed
3.70 cu yd
Slab area
200 sq ft
Concrete needed
3.70 cubic yards4.00 CY with 8% waste — order this much
80-lb bags
180 bagsor 240 × 60-lb bags
Ready-mix cost (est.)
$700~$175/CY delivered
Doing this for work? Estimate the whole job in minutes.
JRIQ turns plans and site photos into full material + labor estimates with AI — built by the team behind these calculators.
Try it free →

How this is calculated

Concrete volume = area × thickness. We convert to cubic yards (the unit ready-mix is sold in), then add 8% for spillage and over-ordering — the same waste factor used in professional estimating.